Christina and John Markey Memorial Bridge
Location
Revere Beach, MA
Type
Cable-Stayed Bridge
Services
Conceptual and Preliminary Design
Cost
$1.8 Million
Completion
2012
Client
City of Revere, Massachusetts and the Massachusetts Bay Transit Authority (MBTA)
Awards
- 2014 American Institute of Steel Construction (AISC) – National Steel Bridge Alliance Prize Bridge Award – Special Purpose
Merit Award for Outstanding Design in Structural Steel